Construction Business Cashflow: Why CIS, VAT and Materials Matter
Construction businesses rarely fail because they have no work
Many construction businesses run into difficulty while their order book looks strong.
The business may have:
- Several active sites
- Rising turnover
- Profitable quotations
- Customers who eventually pay
- A pipeline of new contracts
It can still run short of money.
Construction creates a demanding working-capital cycle. Materials, labour, plant, fuel, insurance and site costs may need to be paid before the work is certified. The customer may then pay 30, 45 or 60 days later. CIS can reduce the cash received from invoices. The VAT treatment can change the amount collected, the tax payment date and the timing of refunds. Retentions may remain unpaid long after practical completion.
Profit measures whether income exceeds costs over a period. Cashflow measures when money is actually available.
Both matter, but they answer different questions.
A profitable project can create a large temporary cash deficit. A cash-positive month can also conceal a loss-making project if the business has collected deposits, delayed suppliers or used VAT and CIS money that will soon be due to HM Revenue and Customs.
The solution is not simply to increase sales. The business needs to understand how each contract converts work into cash.
Why construction cashflow is unusually difficult
The construction cash cycle often contains several separate delays:
- The contractor commits to materials and labour.
- Suppliers request deposits or short payment terms.
- Work is completed during the valuation period.
- An application for payment is submitted.
- The customer or quantity surveyor assesses the application.
- A payment certificate is issued, sometimes for less than expected.
- CIS and retention are deducted where relevant.
- The customer pays on the contractual date, or later.
- VAT and CIS are reported according to their own deadlines.
- Input VAT or CIS credits may be recovered or offset later.
The business funds the gap between the early outflows and later usable inflows.
That gap can become larger when:
- Material prices rise after the quotation
- Variations are not approved promptly
- Timesheets or applications are submitted late
- Customers dispute the value of work
- Retentions are withheld
- VAT is accounted for before payment is received
- CIS deductions are higher than expected
- A customer uses the wrong CIS rate
- Input VAT evidence is incomplete
- The business grows across several projects at once
Growth can therefore consume cash even where gross margins remain positive.
The three cashflow systems that must be understood together
For many construction businesses, three systems overlap on the same invoice.
The commercial contract
The contract determines the agreed price, valuation process, payment terms, retention, variations, defects obligations and other commercial deductions.
The Construction Industry Scheme
CIS may require the contractor to deduct tax from the subcontractor's payment. The deduction is normally 20% for a registered subcontractor, 30% where the subcontractor is not registered or cannot be matched, and 0% where HMRC confirms gross payment status.
VAT
VAT determines whether the supplier charges VAT normally, uses the domestic reverse charge, applies a reduced or zero rate, or treats the supply in another way.
These systems interact, but they are not interchangeable.
A material amount might be part of the reverse-charge VAT value but excluded from the CIS deduction base. A retention might reduce the cash released without representing a cost. VAT collected under normal rules belongs to HMRC, even though it appears in the bank account. CIS suffered is a tax credit, even though it reduces the customer's payment.
Reliable cashflow management requires each element to be recorded separately.
CIS deductions: what they do to cash received
Under CIS, a contractor verifies a subcontractor and applies the deduction rate provided by HMRC.
The current rates are:
- 0% for a subcontractor with gross payment status
- 20% for a registered subcontractor where HMRC gives the standard rate
- 30% where the subcontractor is not registered or HMRC cannot match the details
The deduction is an advance payment towards the subcontractor's tax position. It is not a reduction in the subcontractor's turnover and it is not a fee charged by the contractor.
If a subcontractor invoices £20,000 and suffers a valid CIS deduction of £3,000, its accounts should normally record:
- £20,000 of sales, subject to the appropriate VAT treatment
- £17,000 received or due in cash
- £3,000 as CIS tax suffered or a tax receivable
Recording only the £17,000 bank receipt understates sales and can overstate the customer balance, distort profit margins and make the CIS credit difficult to recover.
HMRC's guidance for CIS subcontractors confirms that the deductions are advance payments and explains how they are claimed.
How CIS deductions are calculated
The contractor starts with the gross invoice amount and removes amounts that are excluded from the CIS deduction calculation.
Subject to the detailed rules, exclusions can include:
- VAT
- Materials paid for directly by the subcontractor
- Certain consumable stores
- Fuel used for the work, excluding travel fuel
- Plant hired for the job
- Manufacturing or prefabricating materials
The HMRC-authorised percentage is then applied to the remaining amount.
Materials are a frequent area of error. The contractor can ask for evidence that the subcontractor paid for the materials directly. An amount described as materials on an invoice is not automatically deductible from the CIS calculation.
The materials exclusion should reflect qualifying direct cost, not an unsupported estimate designed to reduce CIS. Labour, overhead recovery and profit cannot be relabelled as materials.
HMRC sets out the calculation in its CIS deduction guidance.
Worked example: profit does not equal available cash
Assume a VAT-registered subcontractor completes a standard-rated construction package for a VAT-registered contractor. The domestic reverse charge applies.
The invoice contains:
- Labour and service value: £40,000
- Direct materials: £10,000
- Total net sale: £50,000
- Reverse-charge VAT at 20%: £10,000 for the customer to account for
The subcontractor does not add the £10,000 VAT to the amount payable.
The contractor has verified the subcontractor at 20%. If the £10,000 material cost is supported and qualifies for CIS purposes, the CIS deduction is calculated on £40,000.
- CIS deduction: £8,000
- Cash paid to the subcontractor: £42,000
Before receiving the customer's payment, the subcontractor has already paid:
- Materials: £12,000 including £2,000 VAT
- Direct labour: £20,000
- Other project overheads: £5,000
Its immediate project cash outflow is £37,000. The customer payment leaves only £5,000 in the bank.
However, on a simplified net-of-VAT profit basis, the project has produced:
- Revenue: £50,000
- Materials excluding recoverable VAT: £10,000
- Direct labour: £20,000
- Other project overheads: £5,000
- Accounting profit before other business costs and tax: £15,000
Why is only £5,000 visible in cash?
- £8,000 has been withheld as CIS tax suffered
- £2,000 of input VAT was paid with the materials and is awaiting recovery through the VAT process
The £10,000 difference has not disappeared, but it is not immediately available to pay the next project's costs.
This is the type of timing gap a project cashflow forecast should reveal before work begins.
CIS suffered is not always recovered quickly
The recovery route depends on the subcontractor's legal structure.
Sole traders and partners
A sole trader or partner normally reports the gross income and CIS deductions on the annual Self Assessment tax return. HMRC offsets the deductions against the final tax and National Insurance position and repays any excess.
This can leave cash tied up for a substantial period, particularly where deductions are suffered early in the tax year.
The subcontractor should therefore maintain a monthly CIS schedule and not wait until the tax return is prepared to discover missing statements.
Limited companies
A limited company normally reports CIS deductions suffered through its payroll using an Employer Payment Summary. HMRC offsets the credit against PAYE, National Insurance and CIS liabilities due from the company.
Unused deductions can be carried forward within the same tax year. Any excess remaining after the tax year may be reclaimed through the relevant HMRC process.
The company should not claim CIS deductions through its Corporation Tax return.
The cashflow benefit depends on the company's payroll and contractor liabilities. A company with a large PAYE bill may use the credit relatively quickly. A labour-light company with little PAYE may carry a substantial balance until a repayment can be obtained.
Missing CIS statements create a cashflow and evidence problem
A subcontractor needs payment and deduction statements to support its CIS claim.
Contractors that make deductions must provide a statement within 14 days of the end of the relevant CIS tax month. The statement should allow the subcontractor to identify the payment, qualifying materials and deduction.
Missing statements can lead to:
- Delayed tax credits
- HMRC queries
- Differences between the subcontractor's claim and contractor returns
- Uncertain customer balances
- Duplicate or omitted deductions
- Time-consuming year-end reconstruction
The subcontractor should reconcile each receipt when it arrives. If £8,000 has been withheld, it should immediately know which certificate and statement support that credit.
A CIS receivable balance that increases every month without reconciliation is not a sign of healthy liquidity.
Contractors must not treat CIS withheld as spare cash
The contractor has the opposite cashflow position.
When it deducts CIS from a subcontractor, it pays less to the subcontractor but owes the deduction to HMRC. The amount withheld is a liability, not income and not a saving on the project.
HMRC requires monthly CIS returns by the 19th following the end of the tax month. Electronic payment is generally due by the 22nd, or the 19th if paying by post.
For example, a contractor deducts £12,000 across several subcontractor payments. Its bank balance may temporarily be £12,000 higher, but the business has also created a £12,000 liability to HMRC.
If that money is used to buy materials or cover another site, the business may be unable to meet the HMRC deadline.
A suitable process is to:
- Record CIS withheld as a liability when each payment is posted
- Reconcile the liability to the monthly CIS return
- Include the payment date in the cashflow forecast
- Reserve the money in the bank where practical
- Review the combined PAYE and CIS payment before the deadline
HMRC confirms the return and payment dates in its monthly return guidance and CIS payment guidance.
The domestic reverse charge changes the cash collected
The VAT domestic reverse charge applies to many standard-rated and reduced-rated construction services within CIS where the required conditions are met.
Instead of charging and collecting VAT, the supplier issues a reverse-charge invoice. The customer accounts for the VAT on its own VAT Return and may recover the same amount as input tax, subject to the normal rules.
For a subcontractor, the immediate effect is simple but significant: the customer does not pay the VAT element.
A £50,000 standard-rated supply would produce a £60,000 invoice under normal VAT accounting. Under the reverse charge, only £50,000 is payable before CIS and other contractual deductions.
That £10,000 was never income or profit under normal accounting. However, many businesses previously benefited from the temporary cash balance between collecting VAT and paying their VAT Return. The reverse charge removes that timing benefit.
HMRC specifically warns that subcontractors may see lower gross cash receipts and may become VAT repayment traders. Its domestic reverse-charge technical guide explains the cashflow impact and permits businesses to apply for monthly VAT Returns where appropriate.
Reverse-charge VAT is not a cash cost in every case
For a fully taxable customer, reverse-charge VAT is often broadly neutral on the same VAT Return.
The customer records the VAT as output tax and claims it as input tax, provided the normal recovery conditions are satisfied.
However, that does not mean the transaction can be ignored.
The entries are still required, and the result may not be neutral where the customer:
- Makes exempt supplies
- Has non-business activity
- Is partly exempt
- Uses the cost for private purposes
- Has restricted input-tax recovery
- Does not hold adequate evidence
A residential property business, for example, may be unable to recover all of the reverse-charge VAT relating to exempt residential rent. It can therefore face a real VAT cost despite not paying the VAT to the supplier.
Cashflow forecasts should reflect the actual recoverable amount, not assume every reverse-charge entry cancels.
Normal VAT can also create a cashflow trap
Not every construction sale is subject to the reverse charge.
Normal VAT may apply to:
- Supplies to private householders
- Supplies to end users that have provided written notification
- Work outside CIS
- Supplies of staff by an employment business
- Certain goods-only or professional-service supplies
- Other transactions outside the reverse-charge conditions
Where normal invoice accounting applies, a VAT tax point can arise before the customer pays. The business may therefore owe VAT to HMRC while the sales invoice remains outstanding.
For example, a contractor raises a £120,000 invoice including £20,000 VAT shortly before the end of its VAT quarter. The customer pays 60 days later, but the VAT Return and payment may become due first.
The contractor has to fund £20,000 unless another scheme, tax-point rule or input VAT position changes the outcome.
The VAT Cash Accounting Scheme can help eligible businesses account for normal sales VAT when customers pay, but it cannot be used for transactions subject to the construction domestic reverse charge. HMRC's VAT Cash Accounting Scheme guidance explains the general eligibility and operation.
VAT collected is not working capital
When normal VAT is charged and paid by the customer, the VAT element increases the bank balance. It does not increase profit.
Using that money to fund payroll, drawings or another project creates a future problem when the VAT Return falls due.
The normal VAT Return and payment deadline is usually one calendar month and seven days after the end of the accounting period. A business should check its exact deadline in its VAT account.
Good practice is to calculate a VAT provision throughout the quarter rather than wait for the return.
The provision should consider:
- Output VAT on normal sales
- Reverse-charge output VAT on purchases
- Recoverable input VAT
- Credit notes
- Import VAT and postponed accounting
- Bad-debt adjustments where applicable
- Partial-exemption restrictions
- Prior-period corrections
The bank balance should not be interpreted without deducting the tax liabilities already embedded within it.
Monthly VAT Returns can improve repayment timing
A subcontractor making mostly reverse-charge sales may pay VAT on materials and overheads without collecting VAT from customers.
This can produce regular VAT repayments.
Quarterly returns may leave input VAT tied up for several months. HMRC allows a business affected by the reverse charge to apply to move to monthly VAT Returns.
Monthly filing can:
- Accelerate valid repayments
- Reduce the period for which material VAT is funded
- Improve alignment between project costs and recoveries
- Make errors visible sooner
It also requires:
- Bookkeeping every month
- Prompt receipt capture
- Monthly VAT reconciliations
- More frequent review and submission
- Careful monitoring of HMRC queries
Moving to monthly returns is useful only if records are kept current. Filing an incomplete return quickly does not improve control.
Materials can consume cash before a project starts
Material-heavy work often requires the largest early cash commitment.
The contractor may need to pay for:
- Supplier deposits
- Bespoke fabrication
- Bulk orders
- Delivery and haulage
- Storage
- Insurance
- Security
- Waste removal
- Replacement of damaged or stolen items
- Price changes on later phases
If the supplier requires payment in 14 days but the customer pays 45 days after certification, the construction business funds the difference.
The accounting margin may be correct, but the cash timing is not self-funding.
A project quote should therefore show both:
- Expected profit over the complete contract
- Maximum cash required before cumulative customer receipts catch up
The second figure is the project's peak funding requirement.
Net cost and gross cash cost are different
A VAT-registered business often evaluates materials at their net cost when calculating profit because recoverable VAT is not an expense.
The supplier still receives the gross cash amount.
If materials cost £30,000 plus £6,000 VAT:
- The profit calculation may use £30,000
- The bank payment is £36,000
- The £6,000 is recovered only through the VAT process, subject to evidence and entitlement
The project cashflow must therefore use £36,000 on the supplier payment date and show the expected VAT recovery separately.
Using £30,000 in both the project margin and cashflow forecast understates the immediate funding need by £6,000.
Materials and CIS are often confused
Qualifying direct materials paid for by the subcontractor can be excluded before the CIS deduction percentage is applied.
That does not mean:
- Every item labelled materials qualifies
- The full selling price of materials can be excluded
- A markup is treated as material cost
- Materials purchased by another party can be claimed by the subcontractor
- The material value is removed from turnover
- The material value is outside reverse-charge VAT
The VAT and CIS calculations use different logic.
For a single supply of construction services with goods, the domestic reverse charge generally applies to the full invoice value when the relevant conditions are met. CIS may still apply only to the amount remaining after supported qualifying material costs are removed.
The invoice and supporting records should make this distinction clear.
Material markups must cover more than purchase price
A contractor that buys materials for £10,000 and recharges £10,000 has not necessarily broken even.
The project may also carry:
- Delivery charges
- Storage costs
- Handling time
- Wastage
- Breakage
- Theft risk
- Supplier finance costs
- Returns and restocking charges
- Warranty responsibility
- Time spent ordering and checking goods
- Price risk between quotation and purchase
A material markup should reflect the commercial responsibility being accepted. It should not be disguised as material cost for CIS purposes.
The business should distinguish:
- Direct material cost
- Material-related project costs
- Overhead recovery
- Profit margin
This improves both pricing and CIS compliance.
Price increases can turn a profitable quotation into a weak contract
A quotation may remain open for weeks or months. Material prices can change before the order is placed.
Cashflow and profit controls should therefore consider:
- How long the quotation is valid
- Whether prices are fixed or provisional
- Whether the contract permits price adjustments
- Whether key suppliers will hold prices
- Whether deposits can secure stock
- Whether the customer will fund off-site materials
- The cost of holding stock early
- The risk of cancellation or redesign
Buying early may protect the margin but increase the funding requirement. Buying late may preserve cash but expose the business to price rises or programme delays.
The right decision depends on the contract, supplier terms and available liquidity.
Retentions delay cash after the work is complete
Construction contracts often allow the customer to withhold part of each certified payment as retention.
A common structure releases one portion at practical completion and the remainder after the defects period. The exact terms vary.
Retention is not normally an expense. It remains an amount potentially receivable, subject to the contract and satisfactory completion. However, it may be unavailable for months or years.
The business may already have paid:
- Materials
- Labour
- Subcontractors
- Plant
- Insurance
- Overheads
- Tax
The project can therefore show a profit while the retention remains locked in debtors.
Each retention should be recorded by:
- Customer
- Project
- Original certificate
- Amount withheld
- Expected first release date
- Expected final release date
- Conditions for release
- Invoice and VAT status
- Person responsible for collection
Old retentions should not sit in trade debtors without active review.
Applications, certificates and invoicing delays matter
A 30-day payment term does not mean cash arrives 30 days after the work is done.
If the business waits ten days to prepare an application, the customer takes another ten days to certify it, and the invoice is then due in 30 days, the operational delay is closer to 50 days.
Weak administration can add unnecessary funding pressure.
Controls should include:
- A calendar of application dates
- Site records supporting completed work
- Signed variation approvals
- Prompt quantity-surveyor review
- Responsibility for issuing invoices
- Follow-up on missing certificates
- Immediate challenge of unexplained reductions
- A clear debt-collection timetable
Improving the application process can release cash without changing prices or taking finance.
Variations can create unfunded work
Construction businesses often perform additional work to protect a programme or customer relationship before the variation price is formally agreed.
The cost is real and immediate. Recovery may be uncertain.
Uncontrolled variations can lead to:
- Materials purchased without an approved budget
- Labour used without a signed instruction
- Disputes over scope
- Delayed certification
- Reduced final accounts
- Margin erosion
- Cash tied up in unbilled work
A variation register should show:
- Date instructed
- Person authorising the work
- Description
- Estimated cost
- Proposed selling price
- Approval status
- Work completed
- Amount applied for
- Amount certified
- Amount paid
The business should set an authority limit for starting unapproved work. Emergency operational decisions may still be necessary, but the financial exposure should be visible.
Work in progress is not cash
Work in progress can increase reported profit or assets before the customer is billed and paid.
That accounting treatment may be correct, but it does not provide liquidity.
A growing work-in-progress balance can indicate:
- More work is being completed between valuations
- Applications are delayed
- Variations have not been agreed
- Projects are being measured optimistically
- Costs are being incurred faster than billing
- Revenue recognition is ahead of cash collection
Management should review work in progress project by project. The question is not only whether the value is supportable, but also when it will become an invoice and when that invoice will become cash.
Customer deductions need to be separated
A remittance may be lower than the invoice for several reasons:
- CIS
- Retention
- Contra charges
- Defect deductions
- Main-contractor discount
- Previous overpayment recovery
- Liquidated damages
- Disputed variations
- Incorrect VAT treatment
Posting the net receipt against sales without analysing these deductions loses essential information.
Each deduction has a different accounting and cashflow consequence:
- CIS creates a tax credit for the subcontractor
- Retention may remain a receivable
- A valid contra charge may be a cost or reduction
- A disputed amount may remain due
- An agreed discount may reduce revenue
- Incorrect VAT requires correction
A remittance reconciliation should be completed before the customer account is cleared.
Turnover growth can make the cash gap worse
Assume one project requires £60,000 of funding at its lowest cash point. The business can support that project from existing cash and a modest facility.
It then wins three similar projects starting in the same month.
The combined peak requirement may approach £180,000 before considering central overheads, tax and delays. The profit opportunity has tripled, but so has the working-capital demand.
This is why rapid growth can create insolvency risk.
Before accepting additional work, management should ask:
- What is the peak cash requirement for each project?
- When do the low points overlap?
- Which projects depend on the same labour or suppliers?
- How much contingency is available?
- What happens if the largest customer pays 30 days late?
- Are VAT and CIS credits recoverable in time?
- Will the facility remain within its limit?
Turnover is not a substitute for funding capacity.
A project cashflow should be built before the contract starts
A useful project cashflow begins with the programme, not the annual accounts.
For each week or month, it should estimate:
Cash outflows
- Material deposits and balances
- Labour and payroll
- Employer National Insurance and pension costs
- Subcontractor payments
- CIS due to HMRC
- Plant and equipment hire
- Fuel and travel
- Site establishment
- Insurance and bonds
- Professional fees
- Waste and security
- Allocated overheads
- VAT paid to suppliers
- Finance costs
Cash inflows
- Deposits
- Interim payments
- Stage payments
- Certified applications
- Normal VAT collected
- Expected input VAT refunds
- CIS offsets or repayments
- Retention releases
- Final account receipts
The forecast should use payment dates, not only invoice dates.
It should also show the lowest cumulative cash point. That figure indicates the funding the project is likely to require if assumptions are met.
Worked example: calculating the peak funding gap
A contractor accepts a £180,000 net contract expected to earn a £27,000 profit.
Before the first customer payment, it expects to fund:
- Material deposits and deliveries: £54,000 including VAT
- Payroll and labour: £32,000
- Plant and site costs: £9,000
- Insurance and allocated overhead: £7,000
The initial cash requirement is £102,000.
The first certified payment is £75,000 net. The domestic reverse charge applies to the contractor's supply, so no VAT is collected. A 20% CIS deduction of £10,000 is made after qualifying material amounts are considered. Retention of £3,750 is also withheld.
The immediate customer receipt is £61,250.
The project remains £40,750 cash-negative before later expenditure and receipts.
The anticipated £27,000 profit does not remove the need to finance that low point.
If the contractor had forecast only the final profit, it might accept the work without sufficient working capital.
Build a rolling 13-week cashflow forecast
An annual cashflow budget is useful for strategy, but construction businesses also need a short-term forecast that is updated frequently.
A rolling 13-week forecast gives enough visibility to see:
- Three monthly payroll cycles
- Quarterly VAT in many cases
- Several CIS deadlines
- Material commitments
- Customer receipts
- Facility usage
- Emerging shortages
Each week, the business should:
- Replace the previous week's estimates with actual bank movements.
- Update customer receipt dates using live credit-control information.
- Add newly approved purchase orders and payroll changes.
- Review VAT, PAYE and CIS amounts.
- Update retentions and disputed applications.
- Test the lowest projected bank balance.
- Decide who is responsible for each corrective action.
A forecast that is not updated becomes a historical document rather than a management tool.
Use three cashflow scenarios
One forecast can create false confidence.
A construction business should normally consider at least three scenarios.
Expected scenario
This uses the best current estimate of certification, collections, costs and tax.
Downside scenario
This might assume:
- The largest customer pays 30 days late
- A valuation is reduced
- Materials cost 5% more
- A retention is delayed
- VAT repayment takes longer
- A variation remains unapproved
Severe but plausible scenario
This could combine a major debtor delay with an unexpected cost or project dispute.
The purpose is not to predict the exact future. It is to understand how much resilience the business has and which event would trigger action.
Measure the right construction cashflow indicators
The bank balance alone is not enough.
Useful indicators include:
Cash runway
Estimate how many weeks of unavoidable payroll, supplier and tax payments available cash can cover.
Debtor days
Monitor how long customers take to pay compared with contract terms. Review by customer because an average can hide one large overdue balance.
Unbilled work
Measure completed work that has not reached an application or invoice. Rising unbilled work is an early warning.
Certification shortfall
Compare amounts applied for with amounts certified. Repeated reductions may indicate weak evidence, disputed scope or overly optimistic applications.
Retention ageing
Track retentions by expected release date and follow up overdue amounts.
Committed material spend
Include approved purchase orders, not only supplier invoices already posted.
CIS suffered balance
Reconcile tax credits to contractor statements and HMRC submissions. Monitor how quickly limited-company credits are used or refunded.
CIS liability
Compare deductions withheld with amounts reported and due to HMRC.
VAT recovery lag
Measure input VAT paid but not yet recovered, particularly where reverse-charge sales make the business a repayment trader.
Project cash variance
Compare actual inflows and outflows with the project forecast. Investigate timing and permanent cost differences separately.
Pricing should include the cost of cash
Two projects with the same accounting margin may not be equally valuable.
One may require £100,000 of funding for four months. Another may be funded by a deposit and staged payments. Even if both produce a £20,000 accounting profit, the second contract may offer a stronger commercial return and lower risk.
Pricing should consider:
- Funding required
- Duration of the funding gap
- Interest and facility fees
- Retention period
- Customer credit risk
- Material-price exposure
- Administration required for valuations and variations
- Probability of disputes
- Opportunity cost of using working capital
A low-margin contract with slow payment can consume capacity that would have supported better work.
Negotiate the cash profile, not only the contract price
A business can improve project cashflow through commercial terms such as:
- Deposits for bespoke or high-value materials
- Payment for off-site materials where properly protected
- Shorter valuation periods
- Clear application and certification dates
- Milestone payments
- Lower retention percentages
- Earlier partial retention release
- Direct payment for agreed material packages
- Price-adjustment clauses for volatile materials
- Advance-payment arrangements supported by appropriate security
- Clear variation approval processes
The customer may not accept every request. However, accepting the headline price without examining the payment profile leaves a major part of the contract unpriced.
Supplier terms can reduce the funding gap
Supplier credit should be negotiated before the order is placed.
Useful steps can include:
- Requesting 30-day rather than immediate payment
- Aligning supplier dates with customer valuation dates
- Splitting large deliveries into phases
- Agreeing deposits and balances rather than full advance payment
- Consolidating purchasing to strengthen bargaining power
- Avoiding excess stock
- Returning unused materials promptly
- Reviewing credit limits before mobilisation
Longer terms should not be achieved by paying late without agreement. That damages relationships, can stop deliveries and may affect credit insurance or future pricing.
Credit control should start before the invoice is overdue
Construction credit control begins with contract setup.
Before work starts, the business should confirm:
- The correct legal customer
- Billing address and accounts contact
- Purchase-order requirements
- Application dates
- Certification process
- Payment terms
- VAT and CIS status
- End-user position where relevant
- Retention terms
- Dispute and notice procedures
After the application is submitted, the responsible person should confirm it has been received and is complete. Once certified, the invoice should be issued promptly. Before the due date, the accounts team should confirm that the invoice is approved for payment.
Waiting until an invoice is overdue gives the customer time to raise administrative issues that could have been resolved earlier.
Do not solve permanent losses with temporary finance
Working-capital finance can help bridge a timing gap. It cannot repair a contract that loses money.
Before arranging finance, management should separate:
- Timing deficits from profitable work
- Permanent margin losses
- Historic tax arrears
- Director drawings
- Capital expenditure
- One-off disputes
Borrowing may be appropriate where a well-supported receipt is expected after the funding period. It is dangerous where the business cannot explain why cash repeatedly fails to recover.
The forecast should show how and when the facility will be repaid, not simply that it is available.
Financing options and their limitations
Depending on the business and contracts, options may include:
- Overdrafts
- Revolving credit facilities
- Invoice finance
- Asset finance for vehicles and plant
- Supplier credit
- Customer deposits
- Director or shareholder funding
- Project-specific finance
Each has costs and conditions.
Invoice finance may exclude retentions, uncertified applications or disputed debts. A lender may apply concentration limits where one main contractor represents most sales. Personal guarantees may be required. Asset finance funds equipment, not payroll or tax. Director funding increases personal exposure.
Finance should follow a reliable forecast and a clear commercial need.
Gross payment status can improve cashflow, but it is not automatic
A CIS subcontractor can apply to HMRC for gross payment status if it meets the required conditions.
Gross payment status means contractors pay without making CIS deductions. This can materially improve cash available during the year.
It does not:
- Remove the final tax liability
- Change the VAT reverse-charge treatment
- Convert unprofitable work into profitable work
- Eliminate the need for tax reserves
- Protect the business from late customer payment
The business must continue meeting HMRC's conditions to retain the status. Before applying, it should ensure filings, payments, business operations and records are in order.
Even with gross payment status, money required for Corporation Tax, Income Tax, PAYE and VAT should be reserved.
Accounting software must record the gross transaction
Bank-feed bookkeeping can be misleading when receipts are net of CIS, retention or other deductions.
For a subcontractor sale, the accounting records may need to show:
- Gross sales value
- Normal VAT or reverse-charge VAT treatment
- CIS tax suffered
- Retention receivable
- Other agreed deductions
- Cash received
- Remaining trade debtor
For a contractor purchase, the records may need to show:
- Gross project cost
- Reverse-charge VAT entries
- CIS withheld
- Retention payable
- Supplier payment
- CIS liability to HMRC
Posting only the bank amount prevents accurate project reporting.
The business should test its VAT and CIS codes, reconcile control accounts and retain the supporting certificate or remittance.
Job costing should be updated during the project
Cashflow management is stronger when linked to live job costing.
Each project should compare:
- Contract value
- Approved variations
- Amount applied for
- Amount certified
- Amount invoiced
- Amount received
- Retention
- Actual materials
- Committed purchase orders
- Labour cost
- Subcontract cost
- Plant and other direct costs
- Forecast cost to complete
- Expected final margin
- Current and forecast cash position
A project can remain on budget overall but still produce a cash crisis because costs are earlier than expected. It can also appear cash-positive because suppliers have not been paid, while the expected final margin is deteriorating.
Both views are required.
Common construction cashflow mistakes
Mistake 1: Using the bank balance as available cash
The bank may contain VAT, CIS withheld, PAYE, retention obligations and supplier money that is already committed.
Available cash should be assessed after near-term liabilities and restricted amounts are considered.
Mistake 2: Recording net CIS receipts as turnover
This understates sales and loses the tax credit. Gross income, cash and CIS suffered should be recorded separately.
Mistake 3: Treating CIS withheld as a saving
The contractor owes the deduction to HMRC. It should be recorded and reserved as a liability.
Mistake 4: Ignoring the 30% CIS rate risk
If a subcontractor is not registered or cannot be matched, HMRC may require a 30% deduction. The difference can destabilise the subcontractor's cashflow.
Onboarding and verification should happen before the first payment.
Mistake 5: Claiming unsupported materials for CIS
Unsupported material amounts can create an incorrect deduction, later liabilities and disputes between contractor and subcontractor.
Mistake 6: Treating material VAT as immediately recovered
The VAT may be recoverable in the accounts, but the supplier has already received the gross payment. The refund or offset occurs later.
Mistake 7: Expecting reverse-charge VAT from the customer
A subcontractor subject to the reverse charge does not collect that VAT. Quotes and cash forecasts should not include it as an inflow.
Mistake 8: Spending normal VAT collected
VAT collected from customers increases cash temporarily but is normally payable to HMRC after input VAT and other adjustments.
Mistake 9: Forecasting invoices instead of receipts
An invoice date does not tell the business when the customer will pay. Use realistic payment dates based on the contract and customer history.
Mistake 10: Ignoring retentions
Retention reduces cash now and may remain outstanding for a long period. It should have its own collection schedule.
Mistake 11: Starting variations without financial control
Unapproved work consumes cash and may never be certified at the expected value.
Mistake 12: Omitting committed purchase orders
The cashflow may look healthy because materials ordered but not yet invoiced are missing.
Mistake 13: Using profit to estimate cash
Profit excludes many timing movements. A £50,000 profit does not show the peak funding requirement.
Mistake 14: Growing several projects at once without funding
Overlapping material and payroll demands can exceed the cash capacity of an otherwise profitable business.
Mistake 15: Waiting until the tax deadline to calculate liabilities
VAT, PAYE and CIS should be estimated throughout the reporting period.
Mistake 16: Relying on annual accounts
Annual accounts may identify last year's profit but are too late to manage next month's wages and suppliers.
Mistake 17: Confusing a VAT refund with profit
A refund often returns VAT already paid to suppliers. It is a cash-timing movement, not new trading income.
Mistake 18: Financing losses without changing the underlying contract
More borrowing delays the problem if prices, productivity or variation recovery are inadequate.
Weekly construction cashflow checklist
Each week, the finance or management team should:
- Reconcile all bank accounts
- Update the 13-week cashflow forecast
- Review customer receipts expected in the next four weeks
- Check applications awaiting certification
- Issue approved invoices promptly
- Chase overdue debts before supplier and payroll dates
- Update the variation register
- Review committed material orders
- Check supplier balances and credit limits
- Update labour and payroll forecasts
- Review CIS deductions suffered and statements missing
- Review CIS withheld and the amount due to HMRC
- Update the VAT provision or expected repayment
- Track retentions due for release
- Compare project cashflows with actual movements
- Investigate projects exceeding their expected funding requirement
- Confirm facility headroom
- Assign actions and deadlines
The review should be based on current evidence, not optimistic payment assumptions.
Month-end financial controls
At each month-end, the business should also:
- Reconcile sales and purchase ledgers
- Post gross transactions rather than only bank receipts
- Reconcile CIS suffered to payment statements
- Reconcile CIS withheld to the contractor return and HMRC liability
- Review VAT codes and reverse-charge entries
- Reconcile VAT control accounts
- Review work in progress and accrued income
- Review retentions and overdue debtors
- Update job costs and forecast costs to complete
- Compare actual gross margin with tendered margin
- Review material price and usage variances
- Accrue uninvoiced supplier costs
- Review director drawings and loans
- Update the tax forecast
- Produce management accounts
- Document corrective actions
Monthly management accounts should explain why cash changed, not simply show the closing balance.
Warning signs that cashflow controls are failing
The business should investigate where:
- Profits are rising but the overdraft is increasing
- Suppliers are paid later each month
- Payroll depends on one customer receipt
- VAT or CIS money is routinely used for other costs
- Applications are prepared after contractual deadlines
- Retentions are not tracked individually
- CIS statements are missing
- VAT repayments are unexpectedly delayed
- Material costs exceed estimates without approved variations
- Work in progress rises faster than invoicing
- Customer accounts contain unexplained credits or deductions
- Manual journals are used to force VAT or CIS balances to agree
- Directors regularly inject emergency funds
- New projects start before earlier projects generate cash
- The accountant receives project information only at year-end
One item may have a reasonable explanation. Several together suggest that the business is funding problems it has not measured.
What to do if a cash shortage is approaching
Act before payments are missed.
Confirm the amount and date
Use the rolling forecast to identify the lowest cash point, which obligations create it and how long it lasts.
Verify expected receipts
Contact customers. Confirm whether applications are certified, invoices are approved and payments are scheduled.
Accelerate valid billing
Submit outstanding applications, variations and invoices. Request release of due retentions.
Review supplier arrangements
Discuss realistic terms before the due date. Do not make promises the business cannot keep.
Protect payroll and statutory obligations
Prioritise payroll, tax and essential operational costs using professional advice where required.
Stop avoidable cash leakage
Delay non-essential capital purchases, drawings and discretionary spending. Review loss-making or unfunded work.
Consider appropriate finance
Provide the lender or broker with current management accounts, a debtor list, project cashflows and a credible repayment route.
Contact HMRC early if tax cannot be paid
HMRC may agree a payment plan where it considers the arrangement affordable. Interest can continue and agreement is not guaranteed. The business should not wait for enforcement action before making contact. See HMRC's guidance for businesses unable to pay tax on time.
Review solvency
If the company cannot pay debts as they fall due, directors should take prompt professional insolvency advice. Continuing to trade without understanding the position can increase losses and director risk.
Frequently asked questions
Why does my construction business show a profit but have no cash?
Cash may be tied up in debtors, retentions, work in progress, CIS suffered and input VAT. The business may also have paid for materials and labour before receiving customer funds.
Profit records income and cost. It does not show when cash moves.
Is CIS deducted from turnover?
No.
CIS suffered is an advance tax payment. The subcontractor should normally record gross sales and a separate CIS tax credit.
Is CIS withheld by a contractor part of its profit?
No.
The contractor owes the deduction to HMRC. It is a liability until paid or validly offset within the PAYE and CIS system.
How much CIS should be deducted?
HMRC tells the contractor which rate to use after verification. The common rates are 0%, 20% and 30%.
The rate is applied to the appropriate amount after valid exclusions, including qualifying direct materials, are considered.
Can a contractor exclude all invoiced materials from CIS?
No.
The exclusion is based on qualifying amounts the subcontractor paid directly. The contractor can request evidence. Markup, labour and unsupported figures should not be treated as material cost.
When must the contractor pay CIS deductions to HMRC?
Payment is generally due by the 22nd after the CIS tax month if paid electronically, or the 19th if paid by post. The monthly return is due by the 19th.
The business should check its HMRC account and payment method.
How does a limited company recover CIS deductions suffered?
It normally reports year-to-date CIS deductions through an Employer Payment Summary and uses the credit against PAYE, National Insurance and CIS liabilities. Excess credit remaining after the tax year may be reclaimed.
It should not claim the deduction through the Corporation Tax return.
How does a sole trader recover CIS deductions?
The sole trader records gross income and CIS deductions on the Self Assessment tax return. HMRC offsets the deductions against the tax and National Insurance due and repays any excess.
Does gross payment status solve cashflow problems?
It can improve cash receipts by removing CIS deductions, but it does not improve margins, accelerate customer payment or remove final tax liabilities.
The business still needs a tax reserve and project cashflow controls.
Why do I no longer receive VAT from the main contractor?
The domestic reverse charge may apply. Where it does, the customer accounts for VAT on its own VAT Return and does not pay that VAT to the supplier.
The invoice must use the correct reverse-charge wording and treatment.
Can reverse-charge VAT be treated as zero rated?
No.
The underlying supply is normally standard or reduced rated. The reverse charge changes who accounts for the VAT, not the VAT rate.
Can I use the VAT Cash Accounting Scheme for reverse-charge sales?
No.
Construction reverse-charge supplies are excluded from the scheme. An eligible business may continue using cash accounting for other qualifying transactions.
Should a repayment trader use monthly VAT Returns?
It may improve cashflow by accelerating valid input VAT repayments. The administrative cost and ability to maintain monthly records should also be considered.
Is input VAT on materials the same as cash in the bank?
No.
The business pays the gross supplier invoice. Recoverable input VAT is claimed later through the VAT Return and may be subject to checks or restrictions.
Do materials remain subject to reverse-charge VAT?
Where materials form part of a single qualifying construction supply, the reverse charge generally applies to the full value. CIS may use a separate calculation that excludes qualifying direct material cost.
Is retention a business expense?
Usually not merely because it has been withheld. It may remain a receivable until released, subject to the contract and any dispute.
It still creates a cashflow delay and should be monitored individually.
How often should a construction cashflow forecast be updated?
A rolling 13-week forecast should normally be updated weekly. Large or high-risk projects may require more frequent monitoring.
Should a forecast include purchase orders that have not been invoiced?
Yes.
Committed spending affects future cash even if the supplier invoice has not arrived. Omitting purchase orders understates the funding requirement.
Can invoice finance fund construction debts?
Sometimes, but eligibility varies. Funders may exclude uncertified applications, disputed debts, retentions or customers exceeding concentration limits.
The terms and true cost should be reviewed carefully.
What should directors do if the company cannot pay HMRC?
Update the cashflow forecast, confirm the amount due and contact HMRC promptly to discuss available options. A payment plan is not automatic and interest may apply.
If the company cannot pay debts generally, directors should obtain insolvency advice without delay.
Construction cashflow should guide decisions before problems arise
Good cashflow management is not simply chasing overdue invoices.
It begins when the business:
- Prices the contract
- Agrees payment terms
- Orders materials
- Plans labour
- Decides whether to accept retention
- Determines the VAT treatment
- Verifies CIS status
- Schedules applications
- Assesses funding
CIS, VAT and materials do not necessarily reduce profit by the amount they reduce the bank balance. Their timing can still determine whether the business can complete the work.
The strongest construction businesses connect estimating, project delivery, bookkeeping and credit control. They know which projects make money, which projects consume cash and when that cash should return.
Speak to PR Accountants Ltd
PR Accountants Ltd helps contractors, subcontractors, property developers and other construction businesses understand their numbers and plan cash before deadlines become urgent.
Our services include:
- Construction bookkeeping
- CIS registration and monthly returns
- CIS deduction reconciliations
- VAT registration and VAT Returns
- Domestic reverse-charge reviews
- Monthly management accounts
- Project and margin reporting
- Cashflow forecasts
- Debtor and retention reviews
- Payroll
- Annual accounts
- Corporation Tax returns
- Self Assessment tax returns
- Accounting-software setup and corrections
- Tax and business advice
We can review the working-capital cycle, identify where money is being delayed and build a practical cashflow process around your projects, VAT and CIS obligations.
PR Accountants Ltd
Email: info@praccounting.co.uk
Telephone: 0330 043 0792
Website: www.praccounting.co.uk
Official guidance
- CIS deductions and subcontractor payments
- CIS monthly return deadlines
- Paying CIS deductions to HMRC
- Claiming CIS deductions suffered
- VAT domestic reverse-charge technical guide
- VAT Return and payment deadlines
- VAT Cash Accounting Scheme
- HMRC payment support
Related articles
- Domestic Reverse Charge VAT in Construction Explained
- Common CIS Mistakes Contractors Make
- Month-End Bookkeeping Checklist for Small Businesses
- Why Turnover Growth Can Hide Falling Profit Margins
- Cashflow Awareness for Business Owners: Why Profit Alone Is Not Enough
- Hiring Your First Employee: Payroll and Cost Considerations
This article provides general information and does not constitute personalised accounting, tax, legal, finance or insolvency advice. CIS, VAT and cashflow outcomes depend on the legal entity, contracts, VAT liability, payment terms, transactions and individual circumstances. Rules and guidance can change.